Selected installation stages
Large systems are delivered through coordinated physical stages.
The machine is only one part of the delivery. Foundation preparation, heavy lifting, machine erection, interface work, testing, and final functional checks must be planned as one controlled program.
Historical team experience. The images are presented anonymously and without customer-specific claims.
01 / Preparation Foundation preparation

02 / Heavy lift Heavy lift

03 / Erection Machine erection
Rotary-table functional demonstration